Airedale Air Conditioning Test Centre
Brand new state of the art factory with a floor area of 23,000 square metres. The production facility includes an industry-leading, purpose-built test centre and state-of-the-art training school regarded as a worldwide centre of excellence for air conditioning.
75 weeks
£4 Million
The project was very challenging in many ways due to the shear size of the project and the tight programme that it had to be constructed in. Our first challenge was to construct the 8000 square metres of insitu concrete deck by week 18 for the steel erector to start. This meant that we had to hit the project hard at the start. Within the first 2 weeks on site we poured 1500 square metres of concrete foundations to create retaining wall bases and removed 10,000 tones of spoil. The first concrete columns were erected in week 3 and the first decking formwork arrived on week 4. The 8000 square metres of Podium Deck was delivered on programme, constructed through the harsh winter of 2014/15, ready for the steel erector.
Contact us today and let GRK Civils help you construct your engineering ambitions